Southern Access Pipeline, Stage II - Several Crossings in Illinois and Wisconsin

Mears completed several crossings in Illinois and Wisconsin installing three 20-inch diameter steel pipelines and three 42-inch diameter steel pipelines.

The 20-inch HDD crossings are part of the Enbridge Southern Lights project which transports diluents through approximately 674 miles of pipeline from Manhattan, Illinois to Clearbrook, Minnesota. The 42-inch HDD crossings are part of the Enbridge Southern Access Expansion project which transports crude oil through approximately 454 miles of pipeline from Superior, Wisconsin to Flanagan, Illinois.

During the Turtle Creek and Illinois River crossings, Mears used 24-inch and 30-inch tandem hole openers to create the 30-inch diameter hole opening for the installation of the 20-inch diameter pipe.

Freezing temperatures during December 2008 (creating wind chill as low as -40 degrees Fahrenheit) were a factor during this project. This forced Mears to set strict precautions on equipment and crews during the installations.

[return to top]

Image Gallery

Project Snapshot

Owner:
Enbridge Energy
General Contractor:
Mears Group, Inc.
Project Details:

Length(s):
Fox River 20": 2,383 ft
Fox River 42": 2,460ft
Illinois River 20": 1,811 ft
Illinois River 42": 1,926 ft
Turtle Creek 20": 2,275 ft
Turtle Creek 42": 2,380 ft
Location: Turtle Creek, Bradford, WI; Fox River - Serena, IL; Illinois River - Marseilles, IL
Pipe: (3) 20-inch steel & (3) 42-inch steel

Rig(s)/Equipment Used:

Mears 880,000 lb. rig, 660,000 lb. rig, 160,000 lb. rig, 60,000 lb. rig and 330,000 lb. rig

Completion Date:
February 2009